Meeting #1874
openPtolemy bi-weekly meeting
Description
Agenda:
1) PTOLEMY prototype is moving to its new location (Chris/Marcello)
2) Report on the answer of the second referee (Chris)
3) MoU: final approval (Alfredo, Chris, Marcello)?
AoB
Minutes:
The container with PTOLEMy prototype components has left Princeton.
The ship will leave NJ on 23rd and it is expected by January 15th or so
to land to Italy.
Chris loaded as much as possible but the inner part of the dilution refrigerator.
It will be shipped later on in a safer way. A picture of the container is attached.
The space at LNGS is ready to host the prototype.
GL Cavoto made available a technician from La Sapienza to help on the prototype assembling.
Please consider to spend some time at LNGS from February on for generic hardware
work for technicians, physicists and students.
Chris received the review (report attached) of the second referee of the paper on the new filter concept.
The review is very positive and the comment and questions will be answered by Chris in the
next weeks. No need to hurry up.
The MoU is in a final shape. At certain point by January we can freeze it and organise a
signing process on the WEB.
It would be nice to have the theory paper ready asap to try to submit it either to JCAP or even try
the same journal of the
other one.
Next meeting on January 9th.
Files
Updated by Marcello Messina over 6 years ago
- File IMG_7328.jpg IMG_7328.jpg added
- File Tully-report-A.pdf Tully-report-A.pdf added
- Description updated (diff)